Vessel Schedule Review
Analysis of cargo pickup at Long Beach Terminal (STE)
The total number of days is calculated from the time the ship sails from Shanghai to the time the STE picks up the container at the Long Beach Port terminal.
- CLX (Henna 042E): Shanghai to Long Beach on the 12th day (Monday, December 11) 100% available for pick-up, the container pick-up rate on that day was as high as57.8%
- CLX+(Nihao 024E):Underwater inspection at the port of departureThe reason is that the Shanghai-Long Beach route is slightly delayed to 12.7 days (Wednesday, December 14) and the container pick-up rate within three days of the ship's arrival (the total number of days is controlled within 16 days) is still as high as62.5%
IPI/MLB service average time node analysis
-
IPI/MLB Service Average Time Node Analysis – Guaranteed Time Arrival Service (GES)
-
IPI/MLB Service Average Time Node Analysis – Non-Guaranteed Time Arrival Service (NON-GES)
52-week ship arrival time at Long Beach Port and container pick-up schedule forecast (December 19 to December 25)
Ship Name | Berth time | Total flight distance/departing from Shanghai | Available time |
---|---|---|---|
Masonville/229E | December 18, 18:57 Sunday | 10.8 days | 35% can be picked up after 06:30 on December 19th / the rest can be picked up after 06:30 on December 20th |
Mason Maui/007E | Tuesday, December 20, 1:00 | 11.6 days | 100% can be picked up after 06:30 on December 21 |
Container dynamic query: cargo.chinamatson.com
Pick-up location: STE1 (Alameda) or STE2 (Carson) No reservation required, pick up at your own convenience